Monthly Archives: September 2015

Pinewood Studios – Gas Pressure Alleviation Design

EPG has recently been employed by Sir Robert McAlpine to design a gas pressure alleviation system for two landfill cells which are being developed for Backlot use as part of the expansion of Pinewood Studios in Slough, Berkshire.  The system … Continue reading

Posted in Design of Hazardous Gas Protection Measures, Gas Protection Measures, Projects | Comments Off